首页> 外文会议>Safe Decommissioning for Nuclear Activities >PLANNING ACTIVITIES FOR ANPP DECOMMISSIONING
【24h】

PLANNING ACTIVITIES FOR ANPP DECOMMISSIONING

机译:ANPP退役的计划活动

获取原文

摘要

The Armenian NPP consists of two WWER-440, model 270 pressurized water reactors. After an earthquake in northern Armenia in December 1988 both units were shut down for safety reasons: Unit 1 in February 1988, Unit 2 in March 1989, respectively. Unit 2 was restarted in November 1995 after a number of safety upgrades. Unit 1 remains in a long-term shutdown mode. The design lifetime of Unit 2 expires in 2015. Opportunity to shutdown earlier has been discussed in the last years. In particular a statement has been issued by EC asking for an early shutdown of Unit 2 in exchange for the TACIS support in implementing the safety upgrades in a short term. Currently the safety improvement program is being successfully implemented in the framework of US DOE and TACIS assistance. At the moment the date of the permanent plant shutdown is not specified.As with many older reactors throughout the world, a decommissioning plan has not been developed for Armenian NPP at the design stage. After shutdown of ANPP in 1988-1989 the radiological characterization campaign at Unit 1 had been carried out.Recently two studies in the decommissioning area have been performed for ANPP.The first one has been carried out under the US DOE Assistance Program. The purpose of this study was to identify and evaluate feasible decommissioning options for ANPP. Some critical issues related to the waste management had been specified and the near-term activities within this project will be focused on issues of waste characterization and information data base creation as an important prerequisite to manage waste safely. The model used to calculate many of the decommissioning costs was NRC CECP reprogrammed for WWER NPPs. The second study had been carried out in the framework of TACIS project "Assistance to Energy Strategic Center". The purpose of the study was to select the best strategy to phase-out and decommission the ANPP and evaluate conditions, implications and consequence of this decision. A suggested solution was a choice of SAFSTOR as a viable decommissioning option.Spent fuel management is not considered part of decommissioning; however it can strongly affect the decommissioning strategy. Currently the spent nuclear fuel is being stored on site in pools and in a newly constructed NUHOMS storage facility built by FRAMATOME under license of USA Transnuclear West Company. The facility includes 11 horizontal storage modules (HSM). Each HSM has a capacity of 56 non-failed fuel assemblies. A capacity of the existing dry storage facility is not sufficient to accommodate all spent fuel generated during plant operation. However, the NUHOMS concept is modular and it is possible to increase the storage capacity. The facility is designed for 50 years storage of spent nuclear fuel.In any case, these studies should be considered as an informative basis only. Much more additional information should be collected and the detailed characterization survey, i.e. the comprehensive engineering and radiological survey, conducted to have sufficient data for all further planning activities.
机译:亚美尼亚核电厂由两个WWER-440 270型压水反应堆组成。 1988年12月亚美尼亚北部发生地震后,出于安全原因,两个单位都被关闭:1988年2月的第1单位,1989年3月的第2单位。在进行了多次安全升级之后,第2单元于1995年11月重新启动。单元1保持长期关机模式。 2号机组的设计寿命将于2015年到期。最近几年已经讨论了更早关闭的机会。特别是,欧共体发表了一项声明,要求提前关闭2号机组,以换取TACIS在短期内实施安全升级的支持。目前,安全改进计划正在美国能源部和TACIS援助框架内成功实施。目前尚无工厂永久关闭的日期。 与世界上许多较旧的反应堆一样,亚美尼亚核电厂尚未在设计阶段制定退役计划。在1988-1989年ANPP关闭之后,在1号机组进行了放射性表征运动。 最近,在退役地区对ANPP进行了两项研究。 第一个是在美国能源部援助计划下进行的。本研究的目的是确定和评估ANPP可行的退役方案。已经指定了与废物管理有关的一些关键问题,该项目内的近期活动将集中在废物表征和信息数据库创建的问题上,这是安全管理废物的重要前提。 NRC CECP为WWER NPP重新编程了用于计算许多退役成本的模型。第二项研究是在TACIS项目“协助能源战略中心”的框架内进行的。研究的目的是选择最佳策略来淘汰和淘汰ANPP,并评估此决策的条件,影响和结果。建议的解决方案是选择SAFSTOR作为可行的退役选项。 乏燃料管理不视为退役的一部分;但是,它会严重影响退役策略。目前,乏核燃料正在现场储存在水池中,并在FRAMATOME的美国Transnuclear West公司许可下建造的新建成的NUHOMS储存设施中。该设施包括11个水平存储模块(HSM)。每个HSM可以容纳56个未失效的燃料组件。现有干式存储设施的容量不足以容纳工厂运行期间产生的所有乏燃料。但是,NUHOMS概念是模块化的,可以增加存储容量。该设施旨在将乏核燃料储存50年。 无论如何,这些研究应仅被视为提供信息的基础。应该收集更多的信息,并进行详细的特性调查,即全面的工程和放射学调查,以便为所有进一步的计划活动提供足够的数据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号