首页> 外文会议>Waste Management Symposium >A Proposed Framework For Planning Deactivation And Decommissioning Engineering And Design Activities To Meet The Requirements Of DOE Order 413.3 A, Program And Project Management For The Acquisition Of Capital Assets
【24h】

A Proposed Framework For Planning Deactivation And Decommissioning Engineering And Design Activities To Meet The Requirements Of DOE Order 413.3 A, Program And Project Management For The Acquisition Of Capital Assets

机译:拟议的停用和退役工程和设计活动的计划框架,以满足DOE Order 413.3 A的要求,资本资产的购置计划和项目管理

获取原文

摘要

This paper applies the DOE O 413.3A Design/Engineering requirements to Deactivation and Decommissioning (D&D) projects. A list of 41 activities for which Design/Engineering is generally required and which are relevant and common to many D&D projects was generated. For several activities in this list, examples of the level of development and/or types of deliverables that might be expected at the completion of the conceptual, preliminary and final project design phases described in the Order are provided. This paper also discusses tailoring the application of the Order to a facility based on the complexity of the facility's engineered systems and the hazards existing in the facility.
机译:本文将DOE O 413.3A设计/工程要求应用于停用和退役(D&D)项目。生成了41个通常需要进行设计/工程并且与许多D&D项目相关且通用的活动的清单。对于此列表中的几个活动,提供了示例中订单描述的概念,初步和最终项目设计阶段完成时预期的开发水平和/或交付类型的示例。本文还讨论了基于设备工程系统的复杂性和设备中存在的危害,针对该设备量身定制订单的应用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号