SAFE DECOMMISSIONING OF MOBILE NUCLEAR POWER PLANT

机译:移动核电站的安全退役

获取原文

摘要

The paper addresses some issues for ensuring radiation safety during the process of decommissioning the 630 kW "Pamir-630D" mobile nuclear power plant (MNPP). That nuclear power plant consisted of a gas cooled reactor (weight of 76.5t), gas turbine-driven set (76t), two control units (2×20t), and an auxiliary unit (20t). The reactor and turbine-driven set were supposed to be put on transport platforms and carried by tractors. The control and auxiliary units were set on track beds. The "Pamir-630D" was constructed and tested in an appropriate building. The set-up time was no greater than six hours after all units of the MNPP had reached the site. The "Pamir-630D" was ready to be moved to another site in 30 hours after the shut down. Service lifetime of "Pamir-630D" was 10 years: 7 years of storage and 3 years of operation. Operational lifetime was no less than 10000 hours (non-stop operational period was no longer than 2000 hours). Dose rate at the boundary of the restrictive area was no more than 6.5 mR/h at the time of reactor operation and no greater than 300 mR/h on the side surface and 1000 mR/h on the end surface of the biological shielding of the reactor, 24 hours after shut down.
机译:本文讨论了在退役630 kW“ Pamir-630D”移动核电站(MNPP)的过程中确保辐射安全的一些问题。该核电站由一个气冷堆(重量为76.5t),燃气轮机驱动机组(76t),两个控制单元(2×20t)和一个辅助单元(20t)组成。该反应堆和涡轮驱动机组原本应该放在运输平台上,并由拖拉机搬运。控制单元和辅助单元设置在轨道床上。 “ Pamir-630D”是在适当的建筑物中建造和测试的。 MNPP的所有单位到达现场后,建立时间不得超过六个小时。关闭后的30个小时内,“ Pamir-630D”已准备好移至另一个站点。 “ Pamir-630D”的使用寿命为10年:7年的存储和3年的运行。运转寿命不少于10000小时(不间断运转时间不超过2000小时)。限制区边界处的剂量率在反应堆运行时不超过6.5 mR / h,侧面的不超过300 mR / h,对生物屏蔽的端面不超过1000 mR / h。反应器关闭后24小时。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号