首页> 外文会议>Twenty-seventh workshop on geothermal reservoir engineering >PROGRESS OF RECENT EXPLORATION AT COVE FORT-SULPHURDALE, UTAH
【24h】

PROGRESS OF RECENT EXPLORATION AT COVE FORT-SULPHURDALE, UTAH

机译:犹他州科夫堡-苏普拉德堡最近的勘探进展

获取原文

摘要

Surface exploration and well drilling began atSulphurdale, Utah in 2001 after a ten-year hiatus.Electrical resistivity measurements were taken in apreviously untested area west of the producing fieldto help identify and rank potential well sites. A 601 mwell was drilled and cased to 396 m and apreliminary temperature survey run. The well hasalready yielded some information for comparisonwith geologic and resistivity models of the area. Thetemperature results are encouraging but notdefinitive. More testing is planned upon the return offavorable weather and surface access. The new wellwas completed without trouble and within budget intwelve days using a conventional rotary rig. Hole andcasings sizes will permit deepening and commercialproduction if budgets and technical indicatorswarrant doing so.
机译:地面勘探和钻井始于 经过十年的中断后,于2001年在犹他州的Sulphurdale居住。 电阻率测量是在一个 生产场西侧以前未经测试的区域 帮助确定潜在井位并对其进行排名。 A 601米 钻了一个井并将其装进396 m, 初步温度调查运行。井有 已经产生了一些信息供比较 与该地区的地质和电阻率模型。这 温度结果令人鼓舞,但并非如此 确定的。计划在返回时进行更多测试 有利的天气和地面通行。新井 顺利完成,预算在 使用传统的旋转钻机需要十二天。孔和 套管尺寸将允许加深和商业化 预算和技术指标的生产 保证这样做。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号