The paper describes the methodology and results of an experimental application of Monte Carlo Risk Analysis to the process of selecting and controlling Management Information System development projects. The investigator tested hypotheses concerning tradeoffs among sophistication of the risk analysis simulation programs, alternative techniques for estimating benefits of an MIS, and managerial acceptance of the results of simulation programs as guides to project decisions.
The experiment was conducted using four different computer programs (two Monte Carlo and two non Monte Carlo) and three benefit-estimation paradigms (incorporating the managerial viewpoint, the management science viewpoint, and the opportunity-cost viewpoint, respectively) as applied to two actual MIS development projects. The data of the experiment were collected using structured interviews and taped de-briefing sessions.
本文描述了蒙特卡洛风险分析在选择和控制管理信息系统开发项目过程中进行实验性应用的方法和结果。研究人员检验了以下假设:在风险分析模拟程序的复杂程度,估算MIS收益的替代技术以及管理人员对模拟程序结果的管理接受作为项目决策指南之间进行权衡。 P>
使用四种不同的计算机程序(两个蒙特卡洛和两个非蒙特卡洛)和所应用的三个收益估计范式(分别结合了管理观点,管理科学观点和机会成本观点)进行了该实验。到两个实际的MIS开发项目。使用结构化访谈和录音简短汇报会收集了实验数据。 P>
机译:开发中的风险和不确定性:在房地产开发项目中使用蒙特卡洛模拟方法作为决策工具的关键评估
机译:使用示例的现金流量折现分析,决策树分析,蒙特卡洛模拟和实物期权评估采矿项目
机译:环境项目评估:带有Monte Carlo模拟算法的基于IRR的决策支持
机译:在矿业投资项目评估中使用蒙特卡洛模拟方法提高计算质量
机译:使用Monte Carlo仿真和其他决策支持工具提高项目概念评估期间的决策分析 - 以尼日利亚陆上/沼泽石油和天然气资产发展为例
机译:使用药物效应相互作用模型和蒙特卡洛模拟研究剂量间隔对阿巴卡韦和氨普那韦组合抗病毒活性的预测影响
机译:结合Monte Carlo模拟和实验设计,将风险和不确定性纳入清洁技术的投资决策:快速热解案例研究