Management of one of the Company's product lines must submit contract bids during one year for manufacture, with start and due dates, any time in the next five years. In the past, management had insufficient information as to the effects a new contract would have on the their manpower requirements, resource utilization, and present contracts. The solution was to simulate production. The results of the simulation was a general schedule for production along with manpower utilization under given capacity constraints. This general schedule is not used for day-to-day scheduling of operations. Rather, it is used for "middle range planning", three months to a couple of years, where manpower levels and equipment are variables instead of constraints. Management reviews the output and makes any desired capacity and/or contract changes. A new simulation is made and the process repeats itself until management has determined what contracts to bid on and what the their manpower and equipment needs will be during the "middle range".

机译:

公司的其中一条产品线的管理层必须在制造的一年内提交合同投标书,并在未来五年中的任何时间提交开始日期和到期日期。过去,管理层没有足够的信息来了解新合同对他们的人力需求,资源利用和现有合同的影响。解决方案是模拟生产。模拟的结果是在给定的产能限制下生产以及人工使用的总体时间表。该常规计划不用于日常操作计划。相反,它用于三个月到几年的“中级计划”,其中人力水平和设备是变量,而不是约束。管理层检查输出,并进行任何所需的产能和/或合同更改。进行新的模拟,然后重复该过程,直到管理层确定了要竞标的合同以及在“中间范围”内将需要多少人力和设备。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号