首页> 外文会议>International Conference on Renewable Power Generation >Overstress Analysis in Substations with High Wind Power Integration: Application to the Brazilian Interconnected Power System
【24h】

Overstress Analysis in Substations with High Wind Power Integration: Application to the Brazilian Interconnected Power System

机译:具有高风电集成的变电站的过光分析:在巴西互连电力系统的应用

获取原文

摘要

The development of wind farms has taken unprecedented priority in recent times. Its fast integration to existing installations can result in overstress problems. This work analyses the overstress impact of the integration of new wind farms in the Brazilian Interconnected Power System. The analysis is focused on the largest producer substation of wind power in the country. Initially, the methodology of overstress analysis in high voltage installations is presented. Both short circuit and overload evaluations are considered. The results show that mitigating measures and operational strategies are fundamental actions to overcome the overstress problems without equipment replacing.
机译:风电场的发展近期持前所未有的优先事项。它与现有安装的快速集成可能导致过度的问题。这项工作分析了巴西互连电力系统新风电场整合的过度影响。该分析专注于该国风电的最大生产变电站。最初,提出了高压安装中的过光分析方法。考虑短路和过载评估。结果表明,减轻措施和业务策略是克服过度物理替代的过度问题的基本行动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号