Available Transfer Capability Calculations Considering Outages

机译:考虑中断的可用传输能力计算

获取原文

摘要

In recent days with the increasing demand of electrical energy the power system is expanding. With the increasing power demand a question arise that whether the existing transmission network is capable to wheel the large amount of power or not. Or what amount of power that can be transferred without any violation of constraints through the transmission network. For this purpose capability of the network must be examined carefully before any transmission of scheduled power to the consumers. The additional amount of power that can be transferred through the network over and above already committed used with out any violation of limits is called Available Transfer Capability (ATC). Thus accurate ATC calculation is very important for the system operators to avoid blackouts. In this paper ATC was calculated using RPF and PTDF-based method considering different conditions of the network i.e. generator outage, line outage etc. DC Power Flow was used and the results were compared with PowerWorldsimulator (PWS).
机译:最近几天随着电能不断增加的电力系统正在扩大。随着功率需求的越来越大,出现了现有传输网络是否能够将大量功率转向。或者可以通过传输网络违反约束的情况来传输多少功率。对于网络的这种目的,必须在任何向消费者传输到消费者的任何预定动力之前仔细检查。可以通过网络逐步传输的额外功率量已经违反了任何违反限制的承诺被称为可用的传输能力(ATC)。因此,精确的ATC计算对于系统操作员来说非常重要,以避免停电。在本文中,使用基于RPF和PTDF的方法计算ATC,考虑到网络的不同条件,即发电机中断,线路中断等。使用DC电力流量,并将结果与​​PowerWorldSimulator(PWS)进行比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号