Available transfer capability calculations considering outages

机译:考虑中断的可用传输能力计算

获取原文
获取原文并翻译 | 示例

摘要

In recent days with the increasing demand of electrical energy the power system is expanding. With the increasing power demand a question arise that whether the existing transmission network is capable to wheel the large amount of power or not. Or what amount of power that can be transferred without any violation of constraints through the transmission network. For this purpose capability of the network must be examined carefully before any transmission of scheduled power to the consumers. The additional amount of power that can be transferred through the network over and above already committed used with out any violation of limits is called Available Transfer Capability (ATC). Thus accurate ATC calculation is very important for the system operators to avoid blackouts. In this paper ATC was calculated using RPF and PTDF-based method considering different conditions of the network i.e. generator outage, line outage etc. DC Power Flow was used and the results were compared with PowerWorldsimulator (PWS).
机译:近年来,随着电能需求的增长,电力系统正在扩展。随着功率需求的增加,出现了一个问题,即现有的传输网络是否能够传递大量的功率。或者可以通过传输网络传输多少功率而不会违反任何约束条件。为此,在将预定的功率传输给用户之前,必须仔细检查网络的功能。在不违反任何限制的情况下,可以通过网络传输的超出已承诺使用的额外功率量称为可用传输能力(ATC)。因此,准确的ATC计算对于系统操作员避免停电非常重要。在本文中,考虑到网络的不同状况(即发电机中断,线路中断等),使用基于RPF和PTDF的方法计算了ATC。使用了直流潮流,并将结果与​​PowerWorldsimulator(PWS)进行了比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号