首页> 外文会议> >Integration of Construction Investment and Progress Control Based on BIM
【24h】

Integration of Construction Investment and Progress Control Based on BIM

机译:基于BIM的建设投资与进度控制的集成

获取原文
获取原文并翻译 | 示例

摘要

Because of the asymmetry of engineering projects' information, construction investment and the progress of the actual value deviates with the plan value frequently. In order to overcome the malpractice of traditional information communication medium, introduced Building Information Model (BIM). On the integrated model of construction investment and progress control present situation research foundation, proposed construction investment and the progress control integrated method based on the BIM, has constructed take WBS as the foundation, the Integration model of construction investment and progress control based on BIM.
机译:由于工程项目信息的不对称性,建设投资和实际价值的进度经常与计划值偏离。为了克服传统信息通信媒体的弊端,引入了建筑信息模型(BIM)。在建设投资与进度控制集成研究现状基础上,提出了基于BIM的建设投资与进度控制集成方法,以WBS为基础,构建了基于BIM的建设投资与进度控制集成模型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号