首页> 外文会议> >Analysis of Time Delays in Projects - Application to Iran and Emerging Countries
【24h】

Analysis of Time Delays in Projects - Application to Iran and Emerging Countries

机译:项目时延分析-应用于伊朗和新兴国家

获取原文

摘要

Numerous projects are underway in emerging countries, such as Iran, where technology transfer and economic expansion are the primary national objectives. However, majority of these projects either fail, according to world class standards, or faced with significant time delays. An initial analysis of selected projects reveals that over 60% of causes belong to organization factors, while environment and personal causes are less than 40%. The overwhelming evidence points of lack of proper project management and education within organization factors. Some prescriptive interventions are proposed to counter organization deficiencies and overcome consistent time delays. A planning stage using project management methodology is essential in this proposal. A proper assessment and treatment of risk should be included in the model. Further analysis is underway to conduct statistical test and dynamic analysis of a larger portfolio of projects. Particular attention is given to effects of company culture, organization structure, top management involvement, and education, all of them of concern to emerging countries
机译:伊朗等新兴国家正在开展许多项目,这些国家的主要目标是技术转让和经济扩张。但是,根据世界一流的标准,这些项目中的大多数要么失败,要么面临重大的时间延迟。对选定项目的初步分析显示,超过60%的原因属于组织因素,而环境和个人原因则不到40%。大量证据表明,在组织因素内缺乏适当的项目管理和教育。提出了一些规范性干预措施,以应对组织的不足并克服持续的时间延迟。在此提案中,使用项目管理方法的规划阶段至关重要。该模型应包括对风险的正确评估和处理。正在进行进一步的分析,以对较大的项目组合进行统计测试和动态分析。特别关注公司文化,组织结构,高层管理人员参与和教育的影响,这些都是新兴国家所关注的

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号