首页> 外文会议> >The Forward Contract Model of Interruptible Load in Power Market
【24h】

The Forward Contract Model of Interruptible Load in Power Market

机译:电力市场中可中断负荷的远期合同模型

获取原文

摘要

Interruptible load management (ILM) is an important part of Demand Side Management (DSM), especially in power market. It has deep influences on reliability and economical operation of power system. How to use a rational model to analyze the ILM becomes a hot topic in China. This paper gives the optimal purchase model of interruptible contract and sets a reasonable selected rule, i. e. the interruptible load should be priorly scheduled in the period with maximal shortage capacity. Based on the rule, the heuristic method is employed to solve the problem. Simulation results of real power system demonstrate the usefulness of the proposed model.
机译:可中断负载管理(ILM)是需求方管理(DSM)的重要组成部分,尤其是在电力市场中。它对电力系统的可靠性和经济运行深入影响。如何使用理性模型来分析ILM成为中国的热门话题。本文给出了可中断合同的最佳采购模式,并设置了合理的所选规则,i。 e。可中断的负载应在最大不足容量的时段中完全安排。基于该规则,采用启发式方法来解决问题。实电系统的仿真结果证明了所提出的模型的有用性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号