首页> 外文会议> >A queueing network approximation of semiconductor automated material handling systems: how much information do we really need?
【24h】

A queueing network approximation of semiconductor automated material handling systems: how much information do we really need?

机译:半导体自动化材料处理系统的排队网络近似值:我们真正需要多少信息?

获取原文

摘要

Queueing networks are sometimes used to model material handling in flexible manufacturing systems. We explore the use of a closed queueing network model to approximate an intrabay automated material handling system (AMHS) in semiconductor manufacturing. Rather than solving the model analytically, we propose simulating it. Current industry models are very complex and require long development and run times. The simulated approximation can be used as an easy and fast alternative. To compare the approximation with the detailed models in use, we employ an information taxonomy to classify AMHS models based on the amount and types of information needed to model the system, and to obtain desired output. This classification aids modelers in determining the level of detail to incorporate in a model based on the objectives of the simulation study.
机译:排队网络有时用于在柔性制造系统中对物料处理进行建模。我们探索使用封闭排队网络模型来估算半导体制造中的海湾内自动材料处理系统(AMHS)。我们建议对其进行仿真,而不是通过解析方式求解模型。当前的行业模型非常复杂,需要较长的开发和运行时间。模拟近似值可以用作简便快捷的替代方法。为了将近似值与使用的详细模型进行比较,我们采用信息分类法,根据对系统进行建模并获得所需输出的信息量和类型,对AMHS模型进行分类。这种分类有助于建模人员根据模拟研究的目标确定要纳入模型的详细程度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号