首页> 外文会议> >Fast transient overvoltages in generator stator windings during interrupted arcing ground-faults
【24h】

Fast transient overvoltages in generator stator windings during interrupted arcing ground-faults

机译:电弧中断接地故障期间发电机定子绕组中的快速瞬态过电压

获取原文

摘要

In the paper the simulation results of ground-fault fast transients in stator windings of unit-connected generators are presented. The simulations were done for different elements connected between generator neutral and ground. Ungrounded neutral, neutral grounded through neutralisers or resistances were considered. The influence of the parameters of the particular grounding elements on the fast transient overvoltages during interrupted arcing ground-faults in the generator stator winding was determined. An additional capacitance to ground of the generator breakers, a real mechanism of ground-fault arc quenching, and real changes in its resistance during fast transients were also taken into account. Comparative simulations of the ground fault overvoltages for units with the biggest difference in parameters (in range 30-1600 MVA) were carried out. It has been found that for the grounding elements analysed the maximum overvoltages will not exceed double amplitude of the generator phase voltage.
机译:在本文中,给出了单元连接发电机定子绕组中接地故障快速瞬变的仿真结果。对连接在发电机中性点和地面之间的不同元件进行了仿真。考虑了不接地的中性点,通过中和器或电阻接地的中性点。确定了特定接地元件的参数对发电机定子绕组中中断电弧接地故障期间快速瞬态过电压的影响。还考虑了发电机断路器接地的额外电容,接地故障电弧熄灭的真实机制以及在快速瞬态过程中其电阻的真实变化。对参数差异最大(在30-1600 MVA范围内)的设备进行了接地故障过电压的比较模拟。已经发现,对于所分析的接地元件,最大过电压将不超过发电机相电压的两倍幅度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号