首页> 外文会议> >A feasibility analysis for the TransAmerica Generation Project (TAGG)-a national grid proposal
【24h】

A feasibility analysis for the TransAmerica Generation Project (TAGG)-a national grid proposal

机译:国家电网提案TransAmerica Generation Project(TAGG)的可行性分析

获取原文

摘要

Summary form only given. This presentation discusses the TransAmerica Generation Grid (TAGG) Project (Transmission Component), a new high-voltage direct current (HVDC) transmission line project that would interconnect Arizona, California, Illinois, the Dakotas, Texas, and the states in between to provide a major new conduit for electricity on a national scale. It is proposed that this approximately $11 billion endeavor be initially financed by the federal government as a Government Sponsored Enterprise (GSE) and subsequent to its construction and becoming operational, would be privatized and operated and managed as a private federally chartered corporation-as is the case with the Federal Home Loan Mortgage Corporation (Freddie Mac), the Federal National Mortgage Corporation (Fannie Mae) and other GSEs. The TAGG project has evolved from discussions within the electrical transmission and utility industries, the coal and wind power industries and among state officials in the West and upper Midwest over the last 15 years. It addresses three major concerns that are currently facing the U.S. power industry: (1) It provides a means to tap the tremendous coal and wind power resources of the Dakotas, Colorado and Wyoming for use by the rest of the country and allows the diversification of wind generated power across a large section of the US; (2) It relieves transmission constraints that exist in the southwest and between the upper Midwest and Texas; and (3) It enhances the deregulation of the U.S. power industry by providing existing generation with better access to new markets.
机译:仅提供摘要表格。本演示文稿讨论了TransAmerica发电网格(TAGG)项目(传输组件),这是一个新的高压直流(HVDC)传输线项目,该项目将互连亚利桑那州,加利福尼亚州,伊利诺伊州,达科他州,得克萨斯州及其之间的州全国范围内重要的新电力输送管道。建议这笔约110亿美元的努力最初由联邦政府作为政府赞助企业(GSE)进行融资,并在其建造并开始运营后将其私有化并作为私人的联邦特许公司进行经营和管理-就像联邦住房抵押贷款公司(Freddie Mac),联邦国家抵押贷款公司(Fannie Mae)和其他GSE的案例。 TAGG项目是在过去15年间,从电力传输和公用事业,煤炭和风能行业以及西部和中西部上层国家官员之间的讨论演变而来的。它解决了美国电力行业当前面临的三个主要问题:(1)它提供了一种利用达科他州,科罗拉多州和怀俄明州巨大的煤炭和风能资源供美国其他地区使用的方法,并允许该州的多元化美国大部分地区的风力发电; (2)缓解西南地区以及中西部和得克萨斯州之间存在的传输限制; (3)通过为现有发电商提供更好的进入新市场的渠道,加强对美国电力行业的放松管制。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号