首页> 外文会议> >A straightforward approach to effort estimation for updating programs in object-oriented prototyping development
【24h】

A straightforward approach to effort estimation for updating programs in object-oriented prototyping development

机译:一种简单的工作量估算方法,用于更新面向对象原型开发中的程序

获取原文

摘要

Discusses the estimation of the effort needed to update programs according to a given requirement change. In object-oriented prototyping development (OO prototyping), the requirement changes occur frequently and regularly. Thus, a simple and fast estimation of effort is strongly required by both developers and managers. However, existing estimation methods cannot be applied to OO prototyping. Therefore, we propose a straightforward approach to effort estimation, which reflects the specific properties of OO prototyping. First, we analyze the following characteristics of OO prototyping: (1) updating activities consist of creation, deletion and modification; (2) the target to be updated has four kinds of types (void type, basic type, library type and custom type); and (3) the degree of information hiding is classified into private, protected and public. Then, we present a new formula E(P,/spl sigma/) to calculate the effort needed to update a program P according to a set of requirement changes /spl sigma/. The formula E(P,/spl sigma/) includes the weighting parameters w/sub upd/, w/sub type/ and w/sub inf-h/ according to the characteristics (1), (2) and (3), respectively. Finally, we conduct experimental evaluations by applying the formula E(P,/spl sigma/) to actual project data in a certain company. The evaluation results prove statistically (to some extent) the validity of the proposed approach.
机译:讨论根据给定的需求更改来更新程序所需的工作量估计。在面向对象的原型开发(OO原型)中,需求更改频繁且定期发生。因此,开发人员和管理人员都强烈要求对工作量进行简单而快速的估算。但是,现有的估计方法不能应用于OO原型。因此,我们提出了一种简单的工作量估计方法,该方法反映了面向对象原型的特定属性。首先,我们分析OO原型的以下特征:(1)更新活动包括创建,删除和修改; (2)要更新的目标有四种类型(空类型,基本类型,库类型和自定义类型); (3)信息隐藏的程度分为私人,受保护和公开。然后,我们提出一个新公式E(P,/ spl sigma /),以根据一组需求变化/ spl sigma /计算更新程序P所需的工作量。公式E(P,/ spl sigma /)根据特征(1),(2)和(3)包括加权参数w / sub upd /,w / sub type /和w / sub inf-h /,分别。最后,我们通过将公式E(P,/ spl sigma /)应用于特定公司的实际项目数据来进行实验评估。评估结果在统计上(某种程度上)证明了该方法的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号