首页> 外文会议> >Development of ATACS and first-phase control run tests (Advanced Train Administration and Communications System)
【24h】

Development of ATACS and first-phase control run tests (Advanced Train Administration and Communications System)

机译:开发ATACS和第一阶段控制运行测试(高级列车管理和通信系统)

获取原文
获取外文期刊封面目录资料

摘要

A conventional train control system uses the information of train location detected by wayside signaling facilities. The system requires, however, enormous number of wayside facilities, which causes the huge cost of maintenance and installation. Applying information and communication technologies, we have developed the Advanced Train Administration and Communications System (ATACS), a new train control system in which each train detects its location by itself, and the main wayside equipment controls the train interval through digital radio communication. We started developing ATACS in 1995 and conducted the first-phase test at Senseki line, a local line in a northern part of Japan, from September 1997 to March 1998. At the test, we confirmed three basic functions of the system, train-location-detection, train-interval control, and transmission of control data by digital radio.
机译:传统的火车控制系统使用路边信号设施检测到的火车位置信息。然而,该系统需要大量的路边设施,这导致了巨大的维护和安装成本。应用信息和通信技术,我们开发了高级列车管理和通信系统(ATACS),这是一种新的列车控制系统,在该系统中,每辆列车都可以自行检测其位置,而主要的路边设备则通过数字无线电通信来控制列车间隔。我们于1995年开始开发ATACS,并于1997年9月至1998年3月在日本北部的本地铁路Senseki线进行了第一阶段测试。在测试中,我们确认了该系统的三个基本功能,即火车位置-通过数字无线电进行检测,列车间隔控制以及控制数据的传输。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号