首页> 外文会议> >A major refurbishment project after 20 years operation at Hunterston B
【24h】

A major refurbishment project after 20 years operation at Hunterston B

机译:在Hunterston B运营20年后的一个大型翻新项目

获取原文
获取外文期刊封面目录资料

摘要

The upgrading of older steam turbine plant with modern technology has become an increasingly attractive way for utilities to increase efficiency and capacity. This paper describes one such upgrade, showing how advances in steam turbine technology have been successfully applied to both components and modules in a 660 MW steam turbine unit at Hunterston Power Station. The challenge of installing the modifications in a short outage time, and the solutions adopted to achieve it, are discussed.
机译:用现代技术升级较旧的蒸汽轮机工厂,已成为公用事业提高效率和容量的越来越有吸引力的方式。本文描述了这样的升级,说明了如何将蒸汽轮机技术的进步成功地应用于亨特斯顿电站的660 MW蒸汽轮机单元中的组件和模块。讨论了在短中断时间内安装修改的挑战以及实现该修改所采用的解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号