首页> 外文会议> >A preliminary flow algorithm of network flow programming in economic dispatching of cascade hydropower station
【24h】

A preliminary flow algorithm of network flow programming in economic dispatching of cascade hydropower station

机译:梯级水电站经济调度中网络流量规划的初步流程算法

获取原文

摘要

In this paper, a network flow model in the economic dispatching of cascade hydroelectric power stations is established. This paper presents a preliminary flow algorithm which uses practical data that reflect the relationship between natural incoming water of the cascade with the maximum installed unit capacity and the distribution of power output among all cascades. Beginning with the distribution of power output, using an iteration method and rectifying deviation, a practical preliminary flow is gained. This algorithm is realized in the economic dispatching of a practical 380 MW four-cascade hydropower station, the results are satisfied, and an example is given in this paper.
机译:本文建立了梯级水电站经济调度中的网络流量模型。本文提出了一种初步的流量算法,该算法使用实际数据来反映具有最大安装容量的级联的自然进水与所有级联之间的功率输出之间的关系。从功率输出的分配开始,使用迭代方法和纠正偏差,获得了实用的初步流程。该算法在实际的380 MW 4梯级水电站经济调度中实现,取得了满意的效果,并给出了算例。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号