This paper considers the task of improving the reliability of electric power to a local area such as a city, major industrial complex or other load center. In simple terms, the reliability of the supply is a function of the following parameters: the load in the area as it fluctuates over time; the maximum amount of power that can be imported from the main grid (this import limit varies by maintenance and forced outage of transmission and generating equipment); and maximum available local generation at any particular time as it is affected by generation maintenance and forced outages. At any particular time, load curtailment will occur if the load exceeds the maximum import into the area plus the maximum generation available in the area. Therefore, reliability of supply to consumers in the area can be measured in terms of statistics of load curtailment. Popular load curtailment measures include frequency of interruptions and energy not served (kWh/year).
机译:本文考虑了提高诸如城市,主要工业园区或其他负载中心等地区的电力可靠性的任务。简而言之,电源的可靠性取决于以下参数:随时间波动的区域负载;可以从主电网输入的最大功率(此输入限制因维护和输电与发电设备的强制停机而有所不同);以及在任何特定时间的最大可用本地发电量,因为它受到发电量维护和强制中断的影响。在任何特定时间,如果负载超过了该区域的最大导入量加上该区域中可用的最大发电量,就会发生负载削减。因此,可以根据减少负荷的统计数据来测量该地区消费者的供电可靠性。常用的削减负荷措施包括中断频率和不使用的能源(千瓦时/年)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号