首页> 外文会议> >The refurbishment of Sloy power station (hydroelectric power)
【24h】

The refurbishment of Sloy power station (hydroelectric power)

机译:Sloy电站的翻新(水力发电)

获取原文
获取外文期刊封面目录资料

摘要

Loch Sloy was the first hydroelectric power scheme developed by Scottish Hydro Electric's predecessor, the North of Scotland Hydro Electric Board. It was built primarily to supply electrical power to Clydeside and Central Scotland and was officially opened by the Queen Mother in 1950. In recent years, the plant at Sloy has exhibited signs of serious deterioration of the mechanical integrity of runners and electrical integrity of generator winding insulation. The authors describe how, in order to secure its asset, Scottish Hydro Electric initiated a programme to refurbish Sloy power station over a five year period concluding in 1996.
机译:Loch Sloy是苏格兰水电公司的前身苏格兰北部水电局开发的第一个水力发电计划。它最初是为克莱德赛德和苏格兰中部提供电力而建造的,1950年由王太后正式开放。近年来,Sloy的工厂表现出流道的机械完整性和发电机绕组的电气完整性严重恶化的迹象。绝缘。作者介绍了为了保护其资产,苏格兰水利电力公司如何启动了一项计划,在1996年结束的五年内对Sloy电站进行了翻新。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号