London Underground's Central Line refurbishment project encompasses the complete refurbishment of the line including the provision of new trains, signalling systems and power supply systems. The power supplies refurbishment concerns renewal of all life expired equipment and the enhancement of equipment to meet increased demands for traction loads to a peak service loading of 36 trains per hour and the upgrading of power feeds to maintenance depots. When finished the total project will have cost approximately Pounds 700 m of which approximately Pounds 50 m will have been spent on the power system refurbishment. The work has been conducted in three stages of which the last was the Eastern section from Bethnal Green substation to Epping substation which is the subject of this paper.
机译:伦敦地下的中央线路翻新项目包括完全翻新的线路,包括提供新的火车,信号系统和电源系统。电力供应翻新涉及所有生命过期设备的更新和设备的增强,以满足牵引载荷的提高需求,每小时36列车的峰值服务负载,并将供电到维护仓库的供电升级。完成后,总项目将花费大约700磅,其中大约50米将花在电力系统翻新上。这项工作是在三个阶段进行的,其中最后一个阶段是来自贝特绿色变电站的东部,即缩高变电站,这是本文的主题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号