The Goose Pond Wetland Restoration Project: Balancing Private Interests with the Goals of Local, State and Federal Governmental Programs

机译:鹅塘湿地恢复项目:平衡私人利益与地方,州和联邦政府计划的目标

获取原文
获取原文并翻译 | 示例

摘要

The restoration of over 2,406 hectares (5,945 acres) of privately owned land to a naturally functioning wetland after 100 years of farming is providing the Indiana Natural Resources Conservation Service (NRCS) with many challenges. The overall goal of the Wetlands Reserve Program is restoration and enhancement of wetlands in order to achieve the greatest wetland functions and values, including optimizingrnwildlife habitat. Achieving these goals and satisfying the needs and priorities of the landowner, various private organizations and local, state and federal agencies has been demanding. To illustrate the complexity, the following is a partial list of issues being addressedrnduring the planning phase of this restoration project: Elevation of a state highway that divides the site; fiber optic and high powered utility crossings; state floodplain regulations; limiting flooding surcharges on adjacent landowners; diverting discharges from two streams into the wetland while satisfying the policy requirements of the local drainage board; closure of county roads as a result ofrnpermanently flooded areas; meeting NRCS design standards for dikes and dams in the creation of wetlands; and the potential transfer of private land into a state wildlife refuge. This paper describes the roles of various private interest groups and local, state and federal agencies; and describes how meeting the jurisdictional guidelines andrntimelines of each is being balanced, touching on what has and has not worked for Indiana NRCS thus far in carrying out this project.
机译:经过100年耕种,将超过2,406公顷(5,945英亩)的私有土地恢复为天然功能的湿地,这给印第安纳州自然资源保护局(NRCS)带来了许多挑战。湿地保护区计划的总体目标是恢复和改善湿地,以实现最大的湿地功能和价值,包括优化野生动植物栖息地。为了实现这些目标并满足土地所有者的需求和优先事项,各种私人组织以及地方,州和联邦机构一直在要求。为了说明复杂性,以下是该修复项目的规划阶段中要解决的部分问题列表:划分站点的国道高程;光纤和大功率公用设施交叉口;国家洪泛区法规;限制相邻土地所有人的洪水附加费;在满足当地排水委员会的政策要求的同时,将两条河流的排放物转移到湿地中;由于永久性洪灾地区而封闭县道;满足NRCS在创建湿地中堤防和水坝的设计标准;以及将私人土地转移到国家野生动植物保护区的潜在可能性。本文描述了各种私人利益团体以及地方,州和联邦机构的作用;并描述了如何平衡每个地区的管辖权准则和时间表,并介绍了迄今为止印第安纳州NRCS开展该项目的成功与否。

著录项

  • 来源
  • 会议地点 Williamsburg VA(US)
  • 作者单位

    United States Department of Agriculture, Natural Resources Conservation Service,6013 Lakeside Boulevard, Indianapolis, IN 46278 PH (317) 290-3200 FAX (317) 232-3225 email: chris.ritz@in.usda.gov;

    rnUnited States Department of Agriculture, Natural Resources Conservation Service, National Water Management Center, 101 East Capitol, Suite B-100, Little Rock, AR 72201 PH (501) 210-8912 FAX (501) 210-8935 email: claudia.scheer@ar.usda.gov;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号