【24h】

Fluvial Modeling ofVentura River Responses to Matilija Dam Removal

机译:文图拉河对马蒂利亚河大坝拆除的响应的河流模型

获取原文
获取原文并翻译 | 示例

摘要

A plan has been made to remove Matilija Dam on the Ventura River. With dam removal, the delta in the reservoir and the downstream channel are expected to undergornmajor changes in morphology. The FLUVIAL–12 model was employed to simulaternreservoir and river channel responses after the dam removal. As the first step, the modelrnwas calibrated using the Ventura River data to establish its validity. In calibration, thernmodel was used to simulate the fluvial processes starting from the time of damrncompletion. The simulated sediment deposition above Matilija Dam matches closelyrnwith the measured deposits by the U. S. Bureau of Reclamation.rnA large amount of sediment has been stored in the reservoir; some of the storedrnsediment will be transported downstream after the dam removal. An importantrnconsequence of dam removal is the major increase of sediment release to the riverrnchannel downstream. The sediment supply to the downstream reach is not only from thernstored sediment in the reservoir but also from natural sediment inflow from the upstreamrnwatershed. Therefore, sediment supply to the downstream reach will exceed the naturalrnsediment flow before the dam presence. This situation tends to overload the downstreamrnreach with sediment to result in excessive deposition. The amount of sediment releasernfrom the area above the removed dam is closely related to the changes in reservoirrnmorphology. It is necessary to model changes in channel bed profile and in channelrnwidth during erosion in order to determine the amount of sediment removal. The amountrnof sediment release may not be simulated using an erodible-bed model but it may berndetermined using an erodible boundary model.
机译:已经制定了拆除文图拉河上的Matilija大坝的计划。随着大坝的拆除,水库和下游河道的三角洲将经历形态上的重大变化。 FLUVIAL-12模型用于模拟拆除大坝后的水库和河道响应。第一步,使用文图拉河数据对模型进行校准,以建立模型的有效性。在校准中,使用该模型来模拟从损伤完成时间开始的河流过程。 Matilija大坝上方的模拟沉积物沉积与美国填海局测得的沉积物非常吻合。大坝拆除后,部分储存的泥沙将被输送到下游。拆除大坝的重要后果是向下游河道的沉积物释放量大大增加。向下游河段的泥沙供应不仅来自储层中储藏的泥沙,还来自上游流域的天然泥沙流入。因此,在大坝存在之前,向下游河段的沉积物供应将超过自然沉积物流量。这种情况往往使下游河段的沉积物超载,导致沉积物过多。从拆除大坝上方的区域释放的泥沙量与储层形态变化密切相关。为了确定沉积物的去除量,有必要对侵蚀过程中河床的剖面和河道宽度的变化进行建模。沉积物的释放量可能无法使用易蚀床模型进行模拟,但可以使用易蚀边界模型来确定。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号