Recent Enterprise CPM developments focus upon activities and away from the relationships between activities that was the hallmark of the original ADM and PERT methodologies. This paper proposes a system to address these issues, designated as RDM or Relationship Diagramming Method. RDM documents the reason for a restraint between two activities. It expands the types of relationships, distinguishing partial performance, passage of time and a new "concurrent relationship." The RDM algorithm provides trend durations based upon actual performance to date and an automated assignment of optimistic and pessimistic durations for an integrated Monte Carlo analysis. ADM was developed in 1956 and PERT in 1958 based largely upon the limitations of computers of that era. PDM was developed using the more, but still limited power of computers in 1964. RDM provides for better planning and scheduling than traditional or current implementations of CPM using the computers of the 21st century.
机译:企业CPM的最新发展侧重于活动,而不再是原始ADM和PERT方法学的标志性活动之间的关系。本文提出了一种解决这些问题的系统,称为RDM或“关系图方法”。 RDM记录了限制两个活动的原因。它扩展了关系的类型,区分了部分绩效,时间的流逝和新的“并发关系”。 RDM算法根据迄今为止的实际表现以及对乐观和悲观持续时间的自动分配提供趋势持续时间,以进行集成的蒙特卡洛分析。 ADM于1956年开发,PERT于1958年开发,主要是基于那个时代计算机的局限性。 PDM是在1964年使用更多但仍然有限的计算机功能开发的。与使用21世纪计算机的CPM的传统或当前实施方式相比,RDM提供了更好的计划和调度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号