THE HESSI PROBABILISTIC RISK ASSESSMENT: A RISK ANALYSIS OF AN EXPLORER PROGRAM SPACECRAFT

机译:HESSI概率风险评估:探究者程序航天器的风险分析

获取原文
获取原文并翻译 | 示例

摘要

This paper describes the procedure used to conduct a probabilistic risk assessment (PRA) for a small science spacecraft, the insights gained from it, the use the project made of it. The study was performed in approximately one month at the request of the Red Team review board before launch in order to gain the top-down risk insights that PRA can provide. The results were useful and used by the HESSI project engineers even though failure rates may have been somewhat overestimated.
机译:本文描述了对小型科学航天器进行概率风险评估(PRA)的程序,从中获得的见解以及由其制成的项目的使用。为了获得PRA可以提供的自上而下的风险见解,应红队审核委员会的要求,在启动前大约一个月进行了这项研究。尽管故障率可能被高估了,但结果还是有用的,并且由HESSI项目工程师使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号