THE STUDY OF CONCESSION PERIOD FOR BUILDING OPERATE TRANSFER CONTRACT PROJECTS —BASED ON REASONABLE INTEREST OF GOVERNMENT

机译:基于政府合理利益的经营转移合同项目建设期限研究

获取原文
获取原文并翻译 | 示例

摘要

The concession period is one of the core elements in the concession agreement for build-operate-transfer( BOT ) infrastructure projects. The concession period is a measure for deciding when the project ownership will be transferred from the investor back to the government concerned; it also demarcates the benefits , authorities, and responsibilities between the government and private investors. Based on the principals of Public and Welfare economics, this paper analyzes the concession period on the angle of view of the BOT project internal attributes, through the standard definition of BOT project inherent attributes, takes the social welfare of BOT project as analysis object, and takes the government on behalf of public interest in the BOT project as analysis perspective, based on this, to define the constraint conditions of the reasonable interest of the government concerned. Then this paper develops an economics model upon the maximal marginal constraint condition of the reasonable interest for the government concerned.
机译:特许期是建造-经营-转让(BOT)基础设施项目特许协议中的核心要素之一。特许期是决定何时将项目所有权从投资者转移回有关政府的措施;它还界定了政府与私人投资者之间的利益,权力和责任。本文基于公共福利经济学的原理,从BOT项目内在属性的角度分析了特许经营期限,通过对BOT项目内在属性的标准定义,以BOT项目的社会福利为分析对象,以BOT项目中代表公共利益的政府为分析视角,在此基础上,确定有关政府合理利益的制约条件。然后,本文针对有关政府在合理利益的最大边际约束条件下建立了经济学模型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号