首页> 外文会议>International Symposium on Modern Tunneling Science and Technology (IS-Kyoto 2001), Oct 30-Nov 1, 2001, Kyoto, Japan >Countermeasures for Surface Settlement in Constructing Shallow Overburden Urban Tunnels Penetrated through Active Fault
【24h】

Countermeasures for Surface Settlement in Constructing Shallow Overburden Urban Tunnels Penetrated through Active Fault

机译:主动断层贯穿浅埋城市隧道施工中地表沉降的对策

获取原文
获取原文并翻译 | 示例

摘要

Recently in Japan, there are increasing number of cases where tunnels are excavated in urban areas through use of a mountain tunnelling method. Under the circumstances, it is required that appropriate Countermeasures against ground subsidence be taken and that lining as well as tunnel support that suit the specific load conditions be constructed. However, their design method has not yet been satisfactorily established. The late application of various Countermeasures to the excavation of the same tunnel has enabled us to compare their results in terms of the topography, ground conditions, and construction conditions. As a result, desirable design approach to the lining and tunnel support of the shallow overburden urban tunnels has considerably been elucidated, in connection with employment of side drift, long steel pipe fore-piling method, and such as Countermeasures against ground subsidence.
机译:最近,在日本,通过山地隧道法在市区开挖隧道的情况越来越多。在这种情况下,要求采取适当的措施防止地面塌陷,并建造适合特定载荷条件的衬砌和隧道支护。但是,它们的设计方法尚未令人满意。在同一条隧道的开挖中各种对策的后期应用使我们能够比较地形,地面条件和施工条件的结果。结果,已经充分阐明了与浅层覆盖城市隧道的衬砌和隧道支护相关的理想设计方法,以及采用了侧向偏移,长钢管预堆积法以及地面沉降对策等方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号