【24h】

Predicted Ground Displacement for the First MRTA Subway in Bangkok Subsoils

机译:曼谷地下土壤中第一个MRTA地铁的预计地面位移

获取原文
获取原文并翻译 | 示例

摘要

The first subway project is under construction to serve the mass transit system of Bangkok city. The system consists of dual tunnels about 20km long with 18 subway stations. The tunnells are seated in the firm first stiff silty clay layer between 15-22 m. depth below ground surface having outside and inside diameter of 6.3 m., and 5.7 m., respectively. The empirical approaches for predicting surface settlement after completion of tunnelling based on Peck (1956) and O'Reilly & New (1982) were presented. The newly developed correlation for predicting subsurface settlement was also proposed. The back analysis based on plain strain FEM analysis was also presented and agrees with field performance. The shear strain of FEM analysis is in the range of 0.1-1% and agrees with the results of self boring pressuremeter tests.
机译:正在建设中的第一个地铁项目将服务于曼谷市的公交系统。该系统由大约20公里长的双隧道和18个地铁站组成。隧道板位于15-22 m之间的坚固的第一层硬质粉质粘土层中。地表以下的深度,外径和内径分别为6.3 m和5.7 m。提出了基于Peck(1956)和O'Reilly&New(1982)预测隧道完工后地表沉降的经验方法。还提出了新开发的用于预测地下沉降的相关性。还提出了基于平面应变有限元分析的反分析,并且与现场性能吻合。有限元分析的剪切应变在0.1-1%的范围内,与自钻孔压力计测试的结果一致。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号