Challenge to cylindrical enlargement of shield machines and underground docking

机译:盾构机圆柱扩建和地下对接面临的挑战

获取原文
获取原文并翻译 | 示例

摘要

For construction of Rinkai-Fukutoshin Line, efforts have been made for shorter construction time while cost reduction is taken into account under the above ground conditions represented by the narrow roads with congested traffic and the multistory buildings as well as complicated subsoil conditions. In the vicinity of the Oimachi station, one shield machine is efficiently used by means of enlarging the diameter at an intermediate shaft, and underground docking in a mechanical shield docking method eliminate the needs of arrival shafts in a narrow road. Making most of such new technology contributes for substantial reduction of construction period and construction cost. This paper reports these new technologies and new construction methods.
机译:在临海-福寿信线的建设中,在以交通拥挤的狭窄道路,多层建筑物以及复杂的地下土为代表的地上条件下,努力缩短施工时间,同时考虑了成本削减。在大井町站附近,通过扩大中间竖井的直径,可以有效地使用一台盾构机,并且采用机械盾构对接方法的地下对接消除了在狭窄道路上到达竖井的需要。充分利用这些新技术有助于大幅减少工期和工程成本。本文报告了这些新技术和新构造方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号