首页> 外文会议>International Symposium on Flood Defence vol.2; 20020910-13; Beijing(CN) >Water use efficiency for sedment transport in the lower Yellow River
【24h】

Water use efficiency for sedment transport in the lower Yellow River

机译:黄河下游输沙水利用效率

获取原文
获取原文并翻译 | 示例

摘要

A four-layer framework was advanced to study the Water Use Efficiency for Sediment Transport (WUEST). The major state parameters at different layers of the system include the incoming water and sediment from the upstream (IWS), the characteristics of river channel (CRC), the sediment carrying capacity of river flow (SCF), and the control capability of hydraulic engineering works (CEW). According to the measured data from 1950 to 1997, the WUEST in four typical reaches of the Lower Yellow River was investigated under different conditions (or IWS), i.e. the natural condition (NC), the engineering-controlled condition (EC), the complex condition (CC) and the abnormal conditions (AC). Comparison was made between different operation schemes in connection with sediment carrying capacity, e.g. the scheme, among others, of using the water in wet season to flush the total sediment load in the whole year. These schemes could decrease water demand for sediment transport and enhance the water use efficiency. The schemes could be implemented by the proper operation of hydraulic engineering works. In addition, thresholds of the water use for sediment transport (WUST) under different conditions were also proposed.
机译:提出了一个四层框架来研究泥沙输送的用水效率(WUEST)。系统不同层的主要状态参数包括来自上游的入水和沉积物(IWS),河道的特征(CRC),河水的沉积物承载能力(SCF)以及水利工程的控制能力作品(CEW)。根据1950年至1997年的实测数据,对黄河下游四个典型河段的WUEST进行了不同条件(或IWS)的研究,即自然条件(NC),工程控制条件(EC),复杂条件。状态(CC)和异常状态(AC)。在不同的操作方案之间就沉积物的承载能力进行了比较,例如该计划除其他外,包括在雨季用水冲洗全年的总沉积物。这些计划可以减少对沉积物运输的需水量,提高用水效率。这些方案可以通过水利工程的适当运作来实施。此外,还提出了在不同条件下用于沉积物运输的用水阈值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号