首页> 外文会议>International Symposium on Earth Reinforcement Nov 14-16, 2001, Fukuoka/Kyushu/Japan >A field instrumentation and FEM analysis for an isolated-reinforced earth wall
【24h】

A field instrumentation and FEM analysis for an isolated-reinforced earth wall

机译:隔离式加筋土墙的现场仪表和有限元分析

获取原文
获取原文并翻译 | 示例

摘要

During the construction of reinforced earth wall, an amount of accumulative horizontal deformation induced by backfilling compaction is inevitable. To reduce the horizontal displacement, an isolated-reinforced earth wall method was developed by isolating the facing blocks from the reinforced embankment. Field tests were performed by sequential construction of a 7.2 m high trial embankment in order to verify the effect of the method. Firstly, a reinforced embankment composed of geogrids, geotextiles and backfills was constructed. As a second construction stage, the facing blocks were installed in front of the embankment. During the construction, displacement pins and strain gauges were used to measure the horizontal deformations of the wall and the tensile strains of geogrids, respectively. Based on the field instrumentations of trial embankment, it is found that the reduction in horizontal displacement of facing blocks is significant; the horizontal deflection in the first construction stage was 70 mm and the corresponding value of second construction was approximately 0(zero). It is also found that the prediction by FEM analysis simulates well the general trend observed from field instrumentation.
机译:在加筋土墙施工过程中,不可避免的会因回填压实而产生水平的累积变形。为了减少水平位移,通过将饰面块与加筋路堤隔离开来,开发了一种隔离加筋土墙方法。为了验证该方法的效果,通过依次建造7.2 m高的试验路堤进行了现场测试。首先,建造了由土工格栅,土工布和回填土组成的加筋路堤。在第二个施工阶段,将饰面砖安装在路堤前面。在施工过程中,使用位移销和应变仪分别测量墙体的水平变形和土工格栅的拉伸应变。根据试验路堤的现场仪器,发现饰面砌块的水平位移的减小是显着的。第一施工阶段的水平挠度为70 mm,第二施工阶段的相应值约为0(零)。还发现,通过有限元分析进行的预测很好地模拟了从现场仪器观察到的总体趋势。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号