【24h】

AIR-CONDITIONING SYSTEM OF SHENZHEN HI-TECH FAIR EXHIBITION CENTER

机译:深圳高新会展中心空调系统

获取原文
获取原文并翻译 | 示例

摘要

China Hi-tech Fair (CHTF) Exhibition Center (CHTFEC) is the most important project of Shenzhen City in the year 1999. CHTFEC has five exhibition halls with architectural area 28,000 m~2 that includes the main hall 11,000 m~2 and other four sub halls each 3,000 m~2. The air-conditioning system is composed of four 600-USRT York chillers, 20 air handling units, four outdoor-air handling units, and several split air-conditioners as well as fan-coil units. As the significant achievements on the system design, the spotlight can focus on: 1) Precise estimation of the cooling load; 2) Right selection of the chillers, air handling units and other equipment; and 3) Optimization of the air distribution design for the high ceiling halls.
机译:中国高交会展览中心(CHTFEC)是1999年深圳市最重要的项目。中国高交会共有五个展厅,建筑面积28,000 m〜2,其中主展厅11,000 m〜2,其他四个各个子厅3,000 m〜2。该空调系统由四个600-USRT约克冷水机组,20个空气处理机组,四个室外空气处理机组,几个分体式空调以及风机盘管组成。作为系统设计的重要成就,聚光灯可以集中在:1)精确估算冷却负荷; 2)正确选择冷却器,空气处理机组和其他设备; 3)优化高天花板大厅的空气分配设计。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号