首页> 外文会议>International SDL and MSC Workshop(SAM 2004); 20040601-04; Ottawa(CA) >Early Validation of Deployment and Scheduling Constraints for MSC Specifications
【24h】

Early Validation of Deployment and Scheduling Constraints for MSC Specifications

机译:MSC规范的部署和调度约束的早期验证

获取原文
获取原文并翻译 | 示例

摘要

Message Sequence Charts are widely used for the specification of functional requirements, including timing requirements. These requirements can be validated and used as input for the design stage, and subsequent phases. Deployment constraints are generally taken into account at the implementation stage only. These constraints may conflict and invalidate some of the functional/behavioral requirements already validated at a high level of abstraction in the requirement phase. In this paper, we propose to take into account some deployment constraints at the very early stage of development and check if the system functional requirements will not be impossible to meet at later stages when constraints like communication channel delays, process assignment to CPUs, and scheduling policies are taken into account.
机译:消息序列图被广泛用于规范功能要求,包括时序要求。可以验证这些需求,并将其用作设计阶段和后续阶段的输入。通常仅在实施阶段考虑部署约束。这些约束可能会冲突,并使某些在需求阶段的较高抽象级别已验证的功能/行为需求无效。在本文中,我们建议在开发的早期阶段就考虑一些部署约束,并检查在诸如通信通道延迟,对CPU的进程分配和调度之类的约束下,在后期阶段是否不会无法满足系统功能要求考虑政策。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号