【24h】

Swedish RPV Surveillance Programs

机译:瑞典RPV监控计划

获取原文
获取原文并翻译 | 示例

摘要

Because the reactors of the Swedish reactor program were erected over a limited period of time, there are significant similarities regarding used materials and manufacturing methods between the different units. Each individual plant is supplied with a plant-specific surveillance program that reflects the materials utilized in the belt-line area form the start of operation. The programs were originally based on U.S. Nuclear Regulatory Commission guidance and supported by ASTM codes and standards, and the reactors were originally constructed for an estimated operating time of 40 years. The programs have been updated to reflect the fact that current planning calls for up to 60 years of operation for several of the most recent plants. The surveillance programs are to be validated and accepted by the Swedish Radiation Safety Authority.
机译:由于瑞典反应堆计划的反应堆是在有限的时间内架设的,因此不同单元之间在用过的材料和制造方法上有很大的相似之处。每个工厂都有一个工厂特定的监视程序,该程序可以反映出生产线一开始就在生产线区域内使用的物料。该计划最初是基于美国核监管委员会的指导,并得到ASTM规范和标准的支持,并且该反应堆最初的建造预期运行时间为40年。程序已更新,以反映以下事实:当前的计划要求几个最新工厂的运行时间长达60年。监视程序应由瑞典辐射安全局验证并接受。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号