【24h】

Ozone System Startup for the River Mountains WaterTreatment Facility

机译:河流山区水处理设施的臭氧系统启动

获取原文
获取原文并翻译 | 示例

摘要

The new River Mountains Water Treatment Facility (RMWTF) was completed andrnplaced into service by the Southern Nevada Water Authority (Authority) in 2002. Therndirect-filtration plant has initial design capacity of 150 mgd and ultimate capacity ofrn600 mgd, and includes pre-ozonation, flocculation, filtration, and disinfection. ThernRMWTF has already proven to be a valued addition to existing water supply systemsrnalready in place within Las Vegas Valley.rnA key treatment process is the preliminary ozone system, located upstream of thernflocculation units. Ozone meets several treatment process goals, including primary
机译:新的河山水处理设施(RMWTF)已于2002年由内华达州南部水务局(Authority)建成并投入使用。直接过滤厂的初始设计能力为150 mgd,最终能力为600 mgd,包括预臭氧处理,絮凝,过滤和消毒。 rnRMWTF已被证明是拉斯维加斯山谷内已经存在的现有供水系统的重要增值。rnr关键处理工艺是位于絮凝装置上游的初步臭氧系统。臭氧满足几个治疗过程目标,包括主要

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号