【24h】

EXPERT ADVICE FOR EXTERNAL HAZARD ASSESSMENT

机译:外部危害评估专家咨询

获取原文
获取原文并翻译 | 示例

摘要

The Fukushima nuclear accident following the Great Tohoku earthquake and tsunami in March 2011 has raised concern about the adequacy of expert advice on external hazards such as earthquakes, tsunamis and extreme weather events. Consequently, the adequacy of the process by which that expert advice is commissioned and accepted is also inherently of concern. A review of the events at Fukushima establishes that expert advice was flawed. Historical evidence of large tsunamis does not appear to have been accounted for in the design basis. Based on the issues raised in the discussions a process for the use of expert advice for external hazards has been outlined. This aims to provide a framework that should be followed to ensure that due diligence has been demonstrated. This process is generic and is therefore applicable to any external hazard. An example can be provided in the context of the United Kingdom. It is not sufficient to describe the UK seismic risk as low and to assess this purely from the historical record. The acceptance process should confirm that probability of very low frequency events has been correctly addressed. When expert advice is commissioned, there are four fundamental quality checks that lie within the due diligence responsibility of the commissioning authority. These are accreditation of the expert(s), validation of advice against real world evidence, peer review and due consideration of dissenting advice. As a more detailed level of examination of a method for quantifying a hazard, a well-established procedure for rating completeness of an engineered system can be adapted to assess fitness for purpose of a theoretical model or analytical system. The engineering procedure is the Technology Readiness Level system, believed to have originated in NASA. The Model Readiness Level version identifies two points of failure in setting of the design basis seismic threat to Fukushima.
机译:2011年3月东北东北地震和海啸后发生的福岛核事故引起了人们对有关地震,海啸和极端天气事件等外部灾害的专家建议是否足够的担忧。因此,委托和接受专家意见的过程的充分性也必然受到关注。对福岛事件的回顾表明,专家的建议存在缺陷。在设计基础上似乎没有考虑到大型海啸的历史证据。基于讨论中提出的问题,概述了使用专家建议应对外部危害的过程。目的是提供一个应遵循的框架,以确保已进行了尽职调查。此过程是通用的,因此适用于任何外部危害。可以在联合王国的背景下提供一个例子。仅将英国地震风险描述为低并仅从历史记录中进行评估是不够的。接受过程应确认非常低频事件的可能性已得到正确解决。委托专家建议后,将有四项基本质量检查属于调试机构的尽职调查责任。这些是对专家的认可,针对真实证据的建议验证,同行评审以及对不同意见的适当考虑。作为对危害量化方法的更详细的检查,可以采用完善的工程系统评级完整性程序来评估理论模型或分析系统的适用性。工程程序是技术准备水平系统,该系统被认为起源于NASA。 “模型准备水平”版本确定了对福岛进行设计基准地震威胁设置的两个故障点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号