【24h】

Integrated OCntrol Process for the Development of the Mined Geologic Disposal SYstem

机译:集成COntrol工艺开发思维地质处置系统

获取原文
获取原文并翻译 | 示例

摘要

The U.S. Department of Energy (DOE) order 430.1, Life Cycle Asset management begins to focus DOE Programs and Prjects on the total system life-cycle instead of looking at project excecution or operation as individual components. As DOE begins to implement this order, the DOE Management and Operating contractors must develop a process to control not only the contract baseline but the overall life-cycle baseline. This paper presents an integrated process that is currently being developed on the Yucca Mountain Project for DOE. The process integrates the current contrac/tproject baseline management process with the configuration management change control process.
机译:美国能源部(DOE)第430.1号命令“生命周期资产管理”开始将DOE计划和项目的重点放在整个系统生命周期上,而不是将项目执行或操作视为单独的组件。在DOE开始执行此命令时,DOE管理和运营承包商必须制定一个流程,不仅要控制合同基准,还要控制整个生命周期基准。本文介绍了目前在DOC的丝兰山项目上正在开发的集成过程。该过程将当前的合同/项目基线管理过程与配置管理变更控制过程集成在一起。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号