DEVELOPMENT OF AN ENGINEERING DESIGN PROCESS AND ASSOCIATED SYSTEMS AND PROCEDURES FOR A UK GEOLOGICAL DISPOSAL FACILITY

机译:英国地质处置设施的工程设计过程及相关系统和程序的开发

获取原文

摘要

In the United Kingdom the Nuclear Decommissioning Authority (NDA) has been charged with implementing Government policy for the long-term management of higher activity radioactive waste. The UK Government is leading a site selection process based on voluntarism and partnership with local communities interested in hosting such a facility and as set out in the 'Managing Radioactive Waste Safely' White Paper (2008). The NDA has set up the Radioactive Waste Management Directorate (RWMD) as the body responsible for planning, building and operating a geological disposal facility (GDF). RWMD will develop into a separately regulated Site Licence Company (SLC) responsible for the construction, operation and closure of the facility. RWMD will be the Design Authority for the GDF; requiring a formal process to ensure that the knowledge and integrity of the design is maintained. In 2010 RWMD published 'Geological Disposal - Steps towards implementation' which described the preparatory work that it is undertaking in planning the future work programme, and the phases of work needed to deliver the programme. RWMD has now developed a process for the design of the GDF to support this work. The engineering design process follows a staged approach, encompassing options development, requirements definition, and conceptual and detailed designs. Each stage finishes with a 'stage gate' comprising a technical review and a specific set of engineering deliverables. The process is intended to facilitate the development of the most appropriate design of GDF, and to support the higher level needs of both the project and the community engagement programmes. The process incorporates elements of good practices derived from other work programmes; including process mapping, issues and requirements management, and progressive design assurance. A set of design principles have been established, and supporting design guidance notes are being produced. In addition a requirements management system is being implemented for the identification, capture, analysis, update, verification, validation and acceptance of requirements for the GDF. This is to ensure that there are traceable links between requirements, and to identify and record the verification/ validation of individual requirements. This paper describes the engineering design process and the supporting documents, systems and procedures. The paper addresses the relationship to the geological disposal programme timeline in 'Geological Disposal - Steps towards implementation' and, from there, to the UK Government 'Managing Radioactive Waste Safely' Programme. It also describes the next steps in the development of the design process, and some of the lessons learnt to date. This paper is made available under the NDA Transparency Policy. The paper may be freely used for non-commercial purposes. However, all commercial uses, including copying and re-publication, require permission from the NDA. All copyright, database rights and other intellectual property rights reside with the NDA. Applications for permission to use the paper commercially should be made to the NDA Information Manager.
机译:在英国,核退役管理局(NDA)负责实施政府对高放射性放射性废物进行长期管理的政策。英国政府正在根据自愿和与有意托管这样的设施的当地社区建立伙伴关系,领导一个选址过程,这在《安全管理放射性废物》白皮书(2008年)中进行了规定。 NDA已成立放射性废物管理局(RWMD),负责规划,建设和运营地质处置设施(GDF)。 RWMD将发展成为一个单独监管的站点许可证公司(SLC),负责该设施的建设,运营和关闭。 RWMD将成为GDF的设计机构;需要正式流程以确保维持设计的知识和完整性。 RWMD在2010年发表了“地质处置-实施步骤”,其中描述了其在规划未来工作计划时正在进行的准备工作,以及交付该计划所需的工作阶段。 RWMD现在已经开发了GDF的设计流程来支持这项工作。工程设计过程遵循分阶段的方法,包括选项开发,需求定义以及概念和详细设计。每个阶段都以“阶段门”结尾,该阶段门包括技术评论和一组特定的工程交付成果。该过程旨在促进最合适的GDF设计的开发,并支持该项目和社区参与计划的更高层次的需求。该过程纳入了从其他工作计划中得出的良好做法的要素;包括过程映射,问题和需求管理以及渐进式设计保证。已经建立了一套设计原则,并且正在产生辅助设计指导说明。此外,正在实施一个需求管理系统,以识别,捕获,分析,更新,验证,确认和接受GDF的需求。这是为了确保需求之间存在可追溯的链接,并标识和记录单个需求的验证/确认。本文介绍了工程设计过程以及支持文档,系统和过程。本文在“地质处置-实施步骤”中阐述了与地质处置计划时间表之间的关系,并在此基础上与英国政府“安全管理放射性废物”计划建立了关系。它还描述了设计过程开发的后续步骤,以及迄今为止所学到的一些经验教训。该文件可在《保密协议》透明政策下获得。该纸可自由用于非商业目的。但是,所有商业用途,包括复制和重新发布,均需获得NDA的许可。所有版权,数据库权利和其他知识产权均归NDA所有。商业用途纸张的许可申请应向NDA信息管理员提出。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号