Ambuklao hydroelectric scheme ― sedimentation of the reservoir and rehabilitation program

机译:Ambuklao水电计划―水库沉淀和修复计划

获取原文
获取原文并翻译 | 示例

摘要

From the beginning of its operation, the Ambuklao scheme, located in the Benguet Province in the north of Luzon Island in the Philippines, suffered a rapid depletion of the reservoir active storage due to the considerable quantity of sediments transported by the various tributaries that flow into the reservoir. The scheme was severely affected by the 1990 Baguio earthquake of exceptional magnitude that triggered the movement of sediments accumulated in the reservoir towards the dam and the intake tower. The intake was submerged by a few meters of sediment leading to the immediate shut down of the plant. Although the plant generation has been restored some time after the event, the difficulty experienced in dredging the intake area and the impossibility to close the intake prevented a proper rehabilitation of the waterways and turbines, which continued to be operated at partial capacity from 1995 until the complete shut down of the plant in September 1999. All possible solution to delay the filling of the reservoir by sediments including flushing and dredging of sediments have shown to be unworkable, environmentally unfriendly or economically unattractive. Sustainable solutions for the rehabilitation of the scheme will therefore have to accept that the filling of the reservoir by sediments is unavoidable, and that the operation mode of the scheme will evolve towards that of a run of river plant. The rehabilitation works, and particularly the new intake structure, have been designed accordingly.
机译:从运行开始,位于菲律宾吕宋岛北部本古特省的安布克劳方案由于各种支流运来的大量泥沙流入库克群岛,使该库的有效存储迅速耗竭。水库。该方案受到1990年碧瑶特大地震的严重影响,引发了水库中积聚的沉积物向大坝和进水塔的运动。进水口被几米厚的沉积物淹没,导致工厂立即关闭。尽管事故发生后一段时间恢复了电厂的发电能力,但疏通进水口的困难以及无法关闭进水口使水路和水轮机无法得到适当的修复,从1995年开始,水路和水轮机一直以部分能力运转,直到事故发生。该厂已于1999年9月完全关闭。所有可能的解决方案(包括冲洗和疏通沉积物)都无法通过沉积物来填充水库,这对解决方案不可行,对环境不利或在经济上没有吸引力。因此,为恢复该计划而采取的可持续解决方案将必须接受,不可避免的是用沉积物来填充水库,并且该计划的运作方式将朝着河厂的方向发展。相应地设计了修复工程,尤其是新的进气口结构。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号