首页> 外文会议>International Congress on Conservation and Rehabilitation of Dams, Nov 11-13, 2002, Madrid, Spain >A historical review of the use of epoxy protected strand for prestressed rock anchors
【24h】

A historical review of the use of epoxy protected strand for prestressed rock anchors

机译:使用环氧树脂保护的预应力锚索的历史回顾

获取原文
获取原文并翻译 | 示例

摘要

Fusion bonded epoxy protected strand has been used in post tensioning applications in North America since 1983, with the first ground anchor project undertaken in 1985. The product has been used in dam anchor tendons since 1991. A recent and significant problem at Wirtz Dam, TX has focused industry attention on vital issues relating to the production, testing, specification, installation, and stressing of the material. It is clear that this problem has raised questions in the industry regarding the use of the product, but the authors believe that through the development and application of appropriate codes, standards, recommendations, and specifications, the inherent advantages of the material can again be routinely exploited in sensible fashion for mutual benefit. The paper provides a historical and technical overview of the use of epoxy protected tendons, primarily in dam rehabilitation.
机译:自1983年以来,熔融粘合的环氧保护绞线就一直用于北美的后张拉应用中,1985年进行了第一个地锚项目。自1991年以来,该产品已用于大坝锚索中。德克萨斯州Wirtz大坝最近遇到的重大问题已将行业注意力集中在与材料的生产,测试,规格,安装和压力有关的重要问题上。显然,这个问题在业界引起了有关产品使用的疑问,但作者认为,通过开发和应用适当的规范,标准,建议和规格,可以再次常规地使用这种材料的固有优点。以明智的方式加以利用以互惠互利。本文提供了主要在大坝修复中使用环氧保护的腱的历史和技术概述。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号