【24h】

GO METHODOLOGY FOR ENGINEERING RISK ANALYSIS

机译:进行工程风险分析的方法论

获取原文
获取原文并翻译 | 示例

摘要

This article discusses the basic concept, definition, and method of GO methodology in order to evaluate and avert the risks of the engineering, such as extended reach drilling. The risks and accidents of drilling have been emphasized more and more. We try to evaluate and avert the risks for the extend reach drilling technique developed up abroad the nineties, it is very important, because it is an advanced and new drilling technique. Due to complexity and randomness of risk, its measurement is very difficulty. Hence, in this paper, the GO methodology is applied to evaluate and avert the risks of extended reach drilling technique. Its conclusion is not only agreed with other methods, but also corresponded to practice. From the point of view of both theory and practice, it is proved that this approach has feasibility and practical value. It may be referred in the work site.
机译:本文讨论了GO方法的基本概念,定义和方法,以评估和避免工程风险,例如大范围钻探。钻井的风险和事故越来越受到重视。我们试图评估和避免90年代国外开发的大范围钻探技术的风险,这一点非常重要,因为它是一种先进的新钻探技术。由于风险的复杂性和随机性,其度量非常困难。因此,在本文中,GO方法可用于评估和避免大范围钻探技术的风险。其结论不仅与其他方法相符,而且与实际相符。从理论和实践的角度出发,证明该方法具有可行性和实用价值。它可以在工作站点中引用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号