REQUALIFICATION OF THE STEAM SUPPLY SYSTEMS OFUNITS 3 AND 4 OF THE KOZLODUY NPP

机译:KOZLODUY核电厂3号和4号机组蒸汽供应系统的重新定性

获取原文
获取原文并翻译 | 示例

摘要

In order to achieve significant advance in operational safety level, the project characteristics, thernpossibility of safety systems upgrading and operational conditions of Units 1 to 4 of the KozloduyrnNPP were an object of very serious and in-depth analysis in the years 1990-2000. This systematicrnevaluation was initiated under the broad international concern resulted from the conclusions of IAEArnmissions held during 1990-1991 to assess the safety of the units. As a result of the efforts of the plantrnstaff and many international experts the operational conditions, design safety and plant managementrnwere dramatically improved which resulted in bringing the plant to a new safety level. This reviewrnalso developed such that the design safety features of Units 3 and 4 are significantly different fromrnthose units of the so-called V-230 group. The principle difference and advantages of Units 3 and 4rndesign were clarified and confirmed. A review process of the changed status of Units 3 and 4 safetyrnwas conducted in 1999-2000 with the help of IAEA experts and the experts of RISKAUDIT andrnWENRA. The process led to the conclusion that the significance of advantages of the safety levelrnneed to be encapsulated within a new safety case and the corresponding set of steps was combined asrna “Project for upgrading the Nuclear Steam Supply System of Units 3 and 4 of Kozloduy NPP tornmodel WWER-440/B-209M”. The completion of the activities under this project is expected in 2002rnfollowing the major implementation phase during 2001/2002 units'outages.
机译:为了在运行安全水平上取得重大进展,1990-2000年期间,对KozloduyrnNPP的第1至第4机组的项目特点,安全系统升级的可能性和运行条件进行了认真认真的深入研究。这项国际评估是在国际社会广泛关注下发起的,这是国际原子能机构在1990-1991年期间举行的评估机组安全性的任务得出的结论。由于工厂员工和许多国际专家的努力,操作条件,设计安全性和工厂管理得到了极大的改善,从而使工厂达到了新的安全水平。这项审查的目的还在于,第3和第4单元的设计安全特征与所谓的V-230组的这些单元明显不同。第三单元和第四单元设计的原理差异和优点已得到澄清和确认。在IAEA专家以及RISKAUDIT和rnWENRA专家的帮助下,于1999-2000年对3号和4号机组的安全状态进行了审查。该过程得出的结论是,必须将安全水平的优势的重要性封装在新的安全案例中,并结合相应的步骤,以“ Kozloduy NPP撕裂模型的3号和4号机组的核蒸汽供应系统升级项目” WWER-440 / B-209M”。在2001/2002年单位停运期间的主要实施阶段之后,预计该项目的活动将于2002年完成。

著录项

  • 来源
  • 会议地点 Vienna(AT)
  • 作者

    IORDANOV; SABINOV; OURUTCHEV; STOEV;

  • 作者单位

    Kozloduy Nuclear Power Plant plc.rnBG–3321 Kozloduy, BulgariarnFax: +3599732591 Email: sabinov@npp.cit.bg;

    Kozloduy Nuclear Power Plant plc.rnBG–3321 Kozloduy, BulgariarnFax: +3599732591 Email: sabinov@npp.cit.bg;

    Kozloduy Nuclear Power Plant plc.rnBG–3321 Kozloduy, BulgariarnFax: +3599732591 Email: sabinov@npp.cit.bg;

    Kozloduy Nuclear Power Plant plc.rnBG–3321 Kozloduy, BulgariarnFax: +3599732591 Email: sabinov@npp.cit.bg;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 辐射防护;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号