STRUCTURAL DESIGN CHALLENGES FOR TWIN TOWER OF 'GATE TO THE EAST', SUZHOU CHINA

机译:苏州“东方之门”双塔的结构设计挑战

获取原文
获取原文并翻译 | 示例

摘要

The 280m high twin tower is the key component of the prominent development, "Gate To The East", Suzhou China. With the theme of being a "Gate to the East", two towers, which are of same height but have different number of storeys, will stand 60m apart at ground level and link together at top 8 floors. The underground light rail transit system will pass right through the "gate" formed by the twin tower. Each tower mainly comprises a reinforced concrete core and composite perimeter columns, linked together by belt trusses and outriggers system at three different mechanical and refuge floors. The continuous change in tower profile from bottom to top necessitates the extensive transfer structures in the middle and high zone of the tower for supporting the additional columns. Among those transfer structures, the long span linking structure located at level of approximately 240m above ground for supporting the top 8 floors between two towers provided the greatest engineering challenge of the project to structural engineers, primarily resulting from that the top linking structure would be subjected to a variety of structural responses arising from gravitational load, wind load, seismic load as well as differential shortening of the towers. Extensive studies have been carried out to evaluate the structural behaviour of the twin tower structure, prior to arriving at the final design of the twin tower structure. This paper will outline how the structural design resolved these engineering challenges, with the focus on those driven by the top linking structure, and meanwhile addressed the architectural, functional as well as economic considerations.
机译:280m高的双子塔是中国苏州“东方之门”这一重要项目的关键部分。以“通往东方的大门”为主题,两座高度相同但层数不同的塔将在地面上相隔60m,并在最高的8层相连。地下轻轨交通系统将直接穿过双子塔形成的“大门”。每座塔主要包括一个钢筋混凝土芯和复合周边柱,它们通过皮带桁架和悬臂系统在三个不同的机械和避难层连接在一起。塔架轮廓从底部到顶部的连续变化,需要在塔架的中部和上部区域使用广泛的转移结构来支撑额外的立柱。在这些转换结构中,位于地面上方约240m处的大跨度连接结构用于支撑两座塔之间的前8层楼,这对结构工程师来说是该项目最大的工程挑战,主要是因为要对顶部连接结构进行处理对重力荷载,风荷载,地震荷载以及塔的差异缩短引起的各种结构响应。在得出双塔结构的最终设计之前,已经进行了广泛的研究以评估双塔结构的结构性能。本文将概述结构设计如何解决这些工程挑战,重点是由顶部链接结构驱动的挑战,同时解决建筑,功能以及经济方面的考虑。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号