【24h】

PILED RAFT DESIGN PROCESS FOR A HIGH-RISE BUILDING ON THE GOLD COAST, AUSTRALIA

机译:澳大利亚黄金海岸高层建筑的桩筏设计过程

获取原文
获取原文并翻译 | 示例

摘要

This paper describes the process of design of a piled raft foundation for a high rise residential building on the Gold Coast in Queensland, Australia. The design process comprised an initial stage of geotechnical site characterization using the results of a series of investigation boreholes to prepare a subsurface model and derive geotechnical parameters for raft and pile design from empirical correlations. Following this a preliminary analysis was undertaken using a combination of elastic theory and allowances for non linear behaviour of the piled raft system to assess the viability of such a foundation system and any potential advantages of a piled raft over conventional fully piled foundation systems. Finally, a detailed analysis was undertaken using the GARP8 computer program. These detailed analyses were used to design a more efficient piled raft system and to provide design actions for structural design of the foundation system for a variety of load combinations.
机译:本文介绍了澳大利亚昆士兰州黄金海岸的一栋高层住宅建筑的桩筏基础的设计过程。设计过程包括岩土工程现场表征的初始阶段,使用一系列调查钻孔的结果来准备地下模型,并根据经验相关性得出用于筏和桩设计的岩土工程参数。在此之后,结合弹性理论和桩筏系统的非线性行为容限进行了初步分析,以评估这种地基系统的可行性以及桩筏相对于常规全桩地基系统的任何潜在优势。最后,使用GARP8计算机程序进行了详细分析。这些详细的分析用于设计效率更高的桩筏系统,并为各种荷载组合的基础系统的结构设计提供设计措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号