【24h】

A LOOP ROUTING APPROACH FOR DECREASING CRITICAL PATH DELAY

机译:减少关键路径延迟的环形路由方法

获取原文
获取原文并翻译 | 示例

摘要

In this paper, we propose a loop routing performance optimization approach, which create loops in the existing routing trees for the purpose of decreasing delay of the selected critical path or maximum delay for a net. The interconnect tree is formulated as a tree of distributed transmission lines and Elmore delay is used for delay calculation. It is proven that the delay of a selected critical path or maximum delay for a net can be reduced dramatically by introducing a new link with appropriate R, C values between the reference node and the critical node in the existing tree topology. We give the wire length selection on the basis of pre-calculated time delay of node and the resistance and capacitance array. Experiments show the effectiveness of our approach for critical path delay minimization.
机译:在本文中,我们提出了一种环路路由性能优化方法,该方法可在现有路由树中创建环路,以减少所选关键路径的延迟或网络的最大延迟。互连树被公式化为分布式传输线树,而Elmore延迟用于延迟计算。事实证明,通过在现有树形拓扑中的参考节点和关键节点之间引入具有适当R,C值的新链接,可以显着减少所选关键路径的延迟或网络的最大延迟。我们根据节点的预先计算的时延以及电阻电容阵列来选择导线长度。实验表明,我们的方法可将关键路径延迟最小化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号