Applications of Probabilistic Safety Assessment in the Nuclear Power Plant Philippsburg (KKP)

机译:概率安全评估在菲利普斯堡核电站(KKP)中的应用

获取原文
获取原文并翻译 | 示例

摘要

This paper presents the experiences gained from the probabilistic safety assessment (PSA) in the Nuclear Power Plant KKP. Although the primary goal for carrying out the PSA in the framework of periodic safety review is understood to be a complementary tool to the deterministic analysis, there were several improvements in the plant resulting from the PSA. The main technical objective of the paper is to show that the PSA not only provides insights in the balance of design, identifies important contribution to the core melt frequency, it also identifies the weak points in the plant. As a result of this, several hardware modifications as well as modifications in the existing administrative procedures, such as instruction manuals and other safety related procedures were carried out. In some cases new procedures had to be written. Furthermore, the PSA in KKP is being used to evaluate the effectiveness of the planned plant modifications and for getting permission from the licensing authorities to carry our preventive maintenance during power operation. There was also an enormous amount of experience gained from the shutdown PSA. There were several weak points identified, mostly with respect to the administrative procedures. The operation manuals have to be rewritten and lot of work needs to be done with respect to the availability of safety related systems during the shutdown period. It is however important that more attention should be given to crucial issues rather than to matters which are not relevant. The experience shows that in many cases unnecessary attention is given to issues which have very low contribution to the safety of the plant such as postulates of pipe breaks in systems which are not subjected to dynamic loads and where leakages are more probable than breaks. Such postulates, which are not realistic and highly improbable, lead to undesirable contribution to the core melt frequency and also to changes in the written procedures which are contra-productive from the viewpoint of shift personnel. It should also be mentioned that in the PSA, models for Common cause failures be used which are realistic. Another issue is the Human Reliability Analysis (HRA). There has been an attempt to make research-projects out of HRA despite the fact that HRA contains a lot of uncertainties anyway. One should be careful that the PSA reflects the reality in the plant. PSA should be rightly used for the purpose it is meant for, such as optimization of the plant processes and plant design.
机译:本文介绍了从核电厂KKP中的概率安全评估(PSA)中获得的经验。尽管在定期安全审查的框架内执行PSA的主要目标被认为是确定性分析的补充工具,但PSA却对工厂产生了一些改进。本文的主要技术目标是证明PSA不仅可以提供对设计平衡的见解,可以确定对堆芯熔化频率的重要贡献,还可以确定工厂中的薄弱环节。结果,进行了几项硬件修改以及对现有管理程序的修改,例如指导手册和其他与安全有关的程序。在某些情况下,必须编写新的程序。此外,KKP中的PSA被用于评估计划中的工厂改造的有效性,并获得许可当局的许可,以在电力运行期间进行预防性维护。关闭PSA还获得了大量经验。确定了几个弱点,主要涉及行政程序。在停机期间,关于安全相关系统的可用性,必须重写操作手册,并且需要完成许多工作。但是,重要的是应更加重视关键问题,而不是无关紧要的问题。经验表明,在许多情况下,对设备安全的贡献很小的问题没有得到应有的重视,例如未承受动态载荷且泄漏比破裂更可能发生的系统中的管道破裂假设。这种不切实际且极不可能的假设会导致对堆芯熔化频率的不良影响,并且还会导致书面程序的变更,这对于轮班人员而言是不利的。还应该提到的是,在PSA中,使用了常见原因失败的模型。另一个问题是人类可靠性分析(HRA)。尽管HRA仍然存在很多不确定性,但仍尝试从HRA进行研究项目。应该注意PSA反映了工厂中的实际情况。 PSA应该正确地用于其目的,例如优化工厂流程和工厂设计。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号