【24h】

Optimising maintenance dredging

机译:优化维护疏ed

获取原文
获取原文并翻译 | 示例

摘要

In a quick scan are shown the basics in the innovation of the maintenance dredging in the port of Rotterdam. The results achieved so far are only possible in a good working relation between the employer and the contractor. As an employer we must avoid to consider the contractor just as a "rent-a-hopper-firm". To optimise the dredging practices it is also of importance to ask one self: 1. Is my way of executing efficient enough? 2. Can it be done in another way? 3. How does my neighbour do it? 4. Is his situation comparable with mine? In other words: "look for reference points to test your own methods of dredging".
机译:快速浏览显示了鹿特丹港口维修疏maintenance创新的基础。到目前为止,只有在雇主和承包商之间建立良好的工作关系,才能取得成果。作为雇主,我们必须避免将承包商视为“漏斗公司”。要优化疏practices实践,自我问问也很重要:1.我的执行方式是否足够有效? 2.可以通过其他方式完成吗? 3.我的邻居怎么做? 4.他的处境可与我的相媲美吗?换句话说:“寻找参考点以测试您自己的挖泥方法”。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号