首页> 外文会议>International Conference on Industrial Engineering and Engineering Management vol.2; 20050423-25; Shenyang(CN) >HEURISTIC APPROACH FOR PROJECT PORTFOLIO SELECTION BASED ON OPTIONS THINKING IN MANUFACTURING SYSTEM
【24h】

HEURISTIC APPROACH FOR PROJECT PORTFOLIO SELECTION BASED ON OPTIONS THINKING IN MANUFACTURING SYSTEM

机译:制造系统中基于选项思考的启发式项目组合选择方法

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

This paper deals with the development of a heuristic approach for project portfolio selection based on options thinking in a manufacturing system. The proposed heuristic consists of a repetitive process for excluding a project proposal that has the lowest option value until resource constraints are satisfied, and a search process for improving a selected portfolio by a repetitive process through a switching mechanism. An example of project portfolio selection in a car manufacturing system is discussed to illustrate the proposed method.
机译:本文研究了基于制造系统中期权思维的启发式方法,用于项目组合选择。提议的试探法包括一个重复过程,该过程用于排除选项值最低的项目建议,直到满足资源约束为止;以及一个搜索过程,用于通过切换机制通过重复过程来改善选定的投资组合。讨论了汽车制造系统中项目组合选择的示例,以说明所提出的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号