首页> 外文会议>International Conference on Hydropower Technology amp; Key Equipment; ; >Stability Analysis on VGS Units Installed in Three Gorges Left Bank HydroPower Plant
【24h】

Stability Analysis on VGS Units Installed in Three Gorges Left Bank HydroPower Plant

机译:三峡左岸水电厂安装的VGS机组的稳定性分析

获取原文
获取原文并翻译 | 示例

摘要

This paper provides an extensive analysis on the operation stability of the VGS units installed in Three Gorges Left Bank Hydro Power Plant on basis of the huge amount of data at No.7 and No.8 unit (VGS units) recorded since commissioning of TN8000 unit condition monitoring system with professional analysis tool associated with TN8000 system, points out the factors influencing the stability of the units. The conclusion of the analysis herein plays an important role to acquisition operation features of VGS units and guiding their operation.
机译:本文基于TN8000机组投运以来记录的7号和8号机组(VGS机组)的大量数据,对安装在三峡左岸水电站的VGS机组的运行稳定性进行了广泛的分析。带有TN8000系统的专业分析工具的状态监测系统,指出了影响机组稳定性的因素。本文的分析结论对于获取VGS单元的运行特征和指导其运行起着重要作用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号